Electrical knowledge
All Electrical knowledge
-
[Industry 4] Testing cables and wire harnesses in the medical device industry
-
[Industry 3] Testing of cables and wire harnesses in the defense industry
-
[Industry 2] Testing of cables and wire harnesses in the aerospace industry
-
[Industry Type 1] Testing of wire harnesses for automobiles
-
[JASO/JIS/IEC] Standards and Inspection Settings for Momentary Disconnection Testing
-
Advantages of cable harness testers ~Efficiency, High-Quality, Traceability~
-
What is Momentary Disconnection??
-
What is the basic testing for wire harness??
-
What criteria should be used for wire harness testing??
-
With the wire harness tester, can you find the incomplete crimping at the terminal or the disconnection of the wire??
-
There are about 5,000 inspection points. How long does it take for the wiring testing??
-
Why are the wiring test thresholds different for each company??
-
Are withstand voltage testing and insulation testing required?
-
Can the wiring testing detect momentary disconnection??
-
What determines the test voltage for withstand voltage test and insulation test?
-
Are 64 applications performed to test the wire harness of 64 circuits in the high voltage testing? Is there a good way to save time??
-
Must Dielectric Withstand Testing be performed for 1 minute (60 seconds)?? There seems to be a case that is completed in one second.
-
A short wire harness passes the high voltage testing. However, why does the same type become NG when the length is long??
-
Can we find the proximity of the conductors on the terminals and processed parts in the high voltage testing?
-
Why do failed results increase during the rainy season and on rainy days in insulation testing??
- Product Search
- Inspection Spec
- Category
- Options
- Discontinued Product
- All Products